|
Heisson Bridge
The new structure was built parallel to the existing bridge, but completed in a way so both the modern and historic structures blend. The road surface was sloped, curved and super elevated, while the arches remained straight, resulting in complex geometries. Extensive environmental permitting was included in this project.
back • next
|
|
 |
|
 |